As a professional manufacturer of PVC Dust Collection Hoses, standardized installation is the basis for ensuring the efficient operation of the dust removal system. Before installation, it is necessary to carefully check the pipe specifications and design drawings to confirm that the pipe diameter, length, and interface form match correctly, and at the same time clean up the debris on the inner wall of the pipe to avoid blockage and affect ventilation efficiency.
During installation, follow the principle of "main trunk first and branch later", use brackets and hangers to fix the pipes, ensure that the horizontal deviation does not exceed 2mm per meter, and the vertical deviation does not exceed 3mm per meter, to prevent dust deposition due to installation tilt. For the connection of PVC pipe fittings, it is necessary to use special glue to evenly apply the socket, rotate 90° after insertion to ensure sealing, and let it stand for more than 24 hours to cure to avoid leakage caused by the glue not drying.
If it is necessary to pass through the wall or floor, a protective sleeve should be installed, the inner diameter of the sleeve should be 1-2 larger than the PVC pipe, and the gap should be filled with fire retardant material. After installation, an air tightness test must be carried out, and leaks must be checked through pressure testing or smoke testing, and repaired in time. In addition, it is recommended to reserve a drainage outlet at the low point of the pipeline to facilitate the cleaning of dust accumulation later. Strictly following the above steps can not only improve the dust removal effect, but also extend the service life of the PVC Dust Collection Hose.